Panel upgrades in Greater Cincinnati typically start at $7,000+ and range higher based on service size, complexity, cable condition, and code requirements. Most residential upgrades take 10 to 16+ hours on-site.
A proper panel upgrade includes the new panel, breakers, permit, inspection, Duke Energy coordination, labeling, testing, and cleanup.
Financing available through Klarna and Wisetack →
Ready for a real estimate? Call (513) 866-8685 or book online.
← Back to Blog